Technical Challenge
Renovating a commercial kitchen plumbing and extraction system within a strict 72-hour window during off-peak hours to avoid business disruption.
Engineering Solution
We scheduled overlapping shifts with round-the-clock technician presence. All piping was pre-fabricated off-site, and extraction ducts were dynamically balanced on-site.
Materials & Fixtures Used
- Grade 316 sanitary stainless steel pipes
- High-capacity commercial grease traps
- Heavy-duty fire-rated extraction hoods
Project Technical Details
Timeline:4 Weeks
Category:restaurant
Technical Scope Delivered
- Advanced Plumbing
- Wall & Floor Tiling
- Gypsum Partitions
Project Gallery of Mastery
View Fullscreen
Transformation Quality

Technical Execution (Before / After)

Initial Condition

Shams Finished Quality
Implementation Process
1
Phase 1: Diagnostic Survey & Approval
Comprehensive diagnostic thermal profiling and mechanical validation check.
2
Phase 2: Safe Isolation & Stripping
Safe isolation grid lock and systematic decommissioning of compromised lines.
3
Phase 3: Luxury Refitting & Finishes
Immaculate installation of selected fixtures, plastering coves, and bookmatched marbles.